| Challenge: |
- Deep rutting on soft waterlogged soil
- Marshy patches blocking key access routes
- High risk of equipment sinking into the ground
|
| Solution: |
Mats installed along key access routes to provide continuous and stable surfaces, strengthen working paths & facilitate continuous movement of cranes and excavators |
| Customer benefits: |
- Formation of load-bearing surfaces to enable continuous movement of cranes and excavators
- Enable work to continue after heavy rainfall
- Reduce / eliminate the need for imported fill materials
|